Generator A Power House Construction

After securing the contract to sell
the green power, construction had began on the power house for
the hydro generator from Germany.
During the construction the generator was to turn up. This was so we
were able to build the power house around the draft tube.
In the picture below you can see (from left) the reducer, inlet,
Campbell(me) and the draft tube.

Here you can see the turbine in place. If you look closely you can
see the draft tube connected below the turbine.

After the building was complete some
commissioning checks
needed to be done before connecting to the grid.
|
|
|