Hydro Generator D (Kaplan Turbine)
Construction of the Pipe

Back to hydro home page.


This is our fourth turbine which is still under construction.

This is another turbine which was built from "Hydroworks". Again we are doing the controls. There have been some little changes on the controls these have been:

-Redlion HMI instead of Schneider push buttons.
- GE SR750 Protection relay instead of Schneider Sepam G40.
- 2 Larger Rittal boxes rather then 3 middle sized Rittal Boxes.

The Civil Work (Safety is Paramount).
With plans from Becca Engineering we knew the size of the concrete and the amount of steel we needed to use. The whole construction is made of Double D16, and is 300mm thick of M40 concrete. Discussions on the farm led to these buildings having another use, a bomb shelter.

With our experience with concrete built up over the construction of the previous three turbines no risks were taken. Safety was still paramount.

This is during construction, as you can see we have the end of the canal and start of the pipe which feds turbine D.
Generator B house


Here is a picture of an onsite safety meeting before construction begins. As you can see we build the dirt up on the outside of the pipe as the concrete is set. This allows for a much safer working practice.
Quality workmanship on control Boxs.

This is the roof of the concrete pipe meeting the walls. There is a 150mm overlap of the roof and shutters, this is to allow the concrete to get up underneath the roof. Ontop of this roof will be another 150mm of Concrete.
Looking up to Generator B